Practical                                                                                              

Efficient                                                                 

Profitable                                     

 

 

 

DO NOT WAIT TOO MUCH TIME THAT IT COULD BE TOO LATE
THE BEST PROTECTION IS THE PREVENTION



INSTALLATION

ASSEMBLY SEQUENCE KIT 1 AND KIT 3

 

WE ADVISE TO TAKE SAFETY MEASURES WITH:

 

-PROTECTIVE EQUIPMENT

-SAFETY LADDER

-OR A BASKET CRANE

Enlarge

 

OPEN A BIT THE RING PC-A TO MAKE EASY THE ASSEMBLY

Enlarge

 

PUT THE RING AROUND THE CENTRAL LEAVES

Enlarge

 

INSERT THE MOBILE SIDE IN THE MIDDLE OF CENTRAL LEAVES

  Enlarge

 

PUSH THE RING TO THE UTMOST DOWN, MAKING SURE THAT THE MOBILE SIDE OF THE RING WILL BE WELL PLACED AND FIXED INSIDE THE CENTRAL LEAVES

  Enlarge

 

TIGHTEN SCREW THE RING TO THE UTMOST AROUND THE LEAVES. TO FINISH THE ASSEMBLY PUTTING THE RING IN HORIZONTAL POSITION. THEN PROCEED WITH THE CONNECTION.

Enlarge

 

HANDY ADVICE: FOR THE AESTHETICS OF THE PALM TREE AND PROTECTION OF THORNS, INSERT THE IRRIGATION PIPE THROUGH A TUBE WITH INSIDE DIAMETER SUPERIOR, PREVIOUSLY INSERTED IN THE MIDDLE OF THE LEAVES.

  Enlarge

 

IN THE CASE OF PC-E THE ASSEMBLY IS MORE EASIER THAN THE OTHER BECAUSE IT'S ENOUGH TURNING AROUND THE HEART OF THE PALM LIKE A SCREW.

Enlarge

 

INJECT INSTALLATION

 

REALLY IMPORTANT:

-TO PREVENT DAMAGE THE BUD OF THE PALM TREE DO NOT DRILL LESS THAN 1 METER AND HALF FROM THE TOP OF THE PALM

TOOLS AND ACCESSORIES NEEDED:

-1 DRILL
-1 DRILL BIT OF 10 mm.
-1 DRILL BIT OF 6 mm AND 50 cm LENGTH
-3 METERS OF WIRE
-1 HOOK TO FIX THE DRUM

 

DRILL A DEPTH OF 10 cm WITH A DRILL BIT OF 10 mm. DRILL DOWN IN A DIAGONALLY DIRECTION TO IMPROVE THE LIQUID FLOW.

Enlarge

 

INSERT THE COPPER TUBE WITH NUT WITH THE HELP OF A RUBBER HAMMER ALLOWING EMERGE 6 cm FOR THE FUTURE CONNECTION

Enlarge

 

WITH THE LONG DRILL BIT OF 6 mm OF DIAMETER, DRILL THROUGH THE COPPER TUBE INSTALLED UNTIL ACHIEVE THE CENTER OF THE TRUNK. REPEAT THE OPERATION TWO OR THREE TIMES TO LEAVE THE HOLE FREE OF WASTES

Enlarge

 

USE THE CONNECTION WITH "T" SHAPE, AS THE FIRST CONNECTION NEAR THE DRUM INJECTION

Enlarge

 

USE THE CONNECTIONS WITH "L" SHAPE FOR FINAL CONNECTIONS

Enlarge

 

TO MAKE EASY THE INSTALLATION OF THE INJECTION DRUM
FOR ATTACH THE DRUM IS RECOMMENDED THE INSTALLATION OF ONE IRON WIRE TO HOOK IT. TO HELP YOU BETTER IN THIS OPERATION WHEN YOU INSTALL IT ALONE, MAKE AS FOLLOW:

FOLD IN "U" SHAPE AN IRON ROD OF 6 mm OF DIAMETER. FOLD THE EXTREMITIES TO MAKE EASY THE HOOK UP.

Enlarge

 

HUG THE TRUNK WITH THE IRON ROD IN "U" SHAPE. HOOK UP THE EXTREMITIES TO MAKE EASY THE NEXT OPERATION.

Enlarge

 

FIX IN ONE EXTREMITY THE IRON WIRE

Enlarge

 

WITHDRAW ALL IN AN OPPOSITE DIRECTION AND LINK THE IRON WIRE EXTREMITIES. THEN HOOK UP THE DRUM

Enlarge

 

INSTALLATION OF THE DRUM INJECTION. FOR THE AESTHETICS OF THE PALM TREE WE ADVISE TO CARRY OUT THE INSTALLATION IN THE HIDDEN SIDE OF THE PALM TREE.

Enlarge

 

COMPLETE ASSEMBLY WITH SPRAY AND INJECTION SYSTEM AND SPRAY PUMP EQUIPMENT.

Enlarge